Limestone Valley

Q4 FY2026 Report

July – September 2026

Quarter at a glance

This quarter, Limestone Valley spent a lot of time investing in student and workforce programs. Three summer interns wrapped a culvert-assessment season that covered 334 sites and helped show that the federally threatened Trispot Darter appears to live in Camp Creek all year, not just during spawning season. We worked with partners like Kaylee Blackburn at the Georgia DNR and Dr. Lugthart from Dalton State College to teach interns about local ecosystems, fish and mussel sampling, and much more. Two more interns are starting this fall. Staff and crews also closed out an access improvement project for the U.S. Forest Service, with more than a dozen new gates and several repaired creek crossings.

The council also signed three new watershed planning grants for the Chattooga headwaters, a new NFWF technical assistance award for Conasauga riparian outreach, and broke ground on a 43-foot bottomless culvert in Murray County, the largest structure in the fish passage project.

This quarter's impact

3
interns hosted this summer, and 2 more starting this fall
334
barriers surveyed, Armuchee Creek watershed
1
new creek where the threatened Trispot Darter appears to live year-round, Camp Creek
13+
access gates built, U.S. Forest Service project
2,027
aquatic barriers surveyed in the Upper Coosa since 2024
$150,000
in new NWQI planning grants, Chattooga headwaters

Progress by project

Fish Passage Culverts, Murray & Whitfield Counties

In Progress

Construction is underway on the largest structure in the project, a 43-foot bottomless culvert in Murray County in the Holly Creek watershed, designed to let the Trispot Darter and Blue Shiner pass beneath the roadway and not constrict the stream. The $910,000 project is funded through a National Fish and Wildlife Foundation award (below) and is scheduled to finish by the end of November. Next up are four more culverts supported by U.S. Fish and Wildlife Service funding: two in Murray County, starting the first week of December and finishing at the end of January, and two in Whitfield County, starting in January and finishing in February. A separate fish passage culvert in Whitfield County was built last year. These sites are part of a larger culvert replacement program covering undersized road culverts in Bartow, Cherokee, Fannin, Gilmer, Gordon, Murray, Pickens, and Whitfield counties, which cleared State Historic Preservation Office review in May. The program replaces aging round culverts with bottomless structures so fish and wildlife can move more freely.

What's planned
  • Replace four more fish passage barriers: two in Murray County and two in Whitfield County
  • Finish the Murray County culvert now under construction by the end of November
  • Open approximately 2 miles of stream

Aquatic Barriers in Conasauga and Coosawattee Basins (GA Department of Natural Resources Partnership)

In Progress

Three summer interns just wrapped the project's third season of culvert-assessment fieldwork, hosted under the America the Beautiful / NFWF cooperative agreement (now called American Ecosystem Restoration). Training ran May 18 through 20, with fieldwork from June 1 through July 30. The team surveyed 334 barriers in the Armuchee Creek watershed, added 20 new sites to the SARP database, and flagged 13 strong candidates for replacement. Interns have since assessed another 162 barriers in the Middle and Upper Conasauga watersheds, with those sites still being added to the project map. This data helps the Trispot Culvert Project team decide which replacements in high-priority watersheds will do the most for long-term fish passage and stream flow.

The season's biggest surprise was finding what appears to be a new year-round population of Trispot Darter, a small, federally threatened fish, in Camp Creek, a tributary to the Oostanaula. The project team first found Trispots spawning there in January 2026, netting 19 within ten minutes, and kept monitoring through the year. Trispots are hard to find outside the breeding season, so it was a real win when the team and interns turned up three adults sharing a cooler, deeper leaf-litter pool on July 17. That is a meaningful data point for prioritizing future barrier removal in the watershed. The barrier surveys also help the team spot potential spawning habitat and build relationships with landowners and local municipalities. Sampling of this federally threatened species is done under appropriate USFWS permits.

This summer's interns came from Dalton State College. They trained in the field with Dr. Lugthart and were mentored throughout the summer by Kaylee Blackburn of Georgia DNR. Two more interns are starting this fall from Dalton State College, working on culvert assessments across multiple counties. Last year's interns came from the University of North Georgia, led by Prof. Andrew Taylor.

What's planned
  • Keep assessing crossings this fall, across multiple counties
  • Replace 6 crossings
  • Complete eDNA sampling

Chattooga Headwaters NWQI, Harrisburg Creek, Town Creek & Cane Creek

Planning

Limestone Valley signed three new NRCS National Water Quality Initiative grants this summer, $50,000 each, to write Nine-Element Watershed Management Plans for three headwater clusters feeding the Chattooga River: Harrisburg Creek, Teloga Creek and Dry Valley; Town Creek and Duck Creek; and Upper and Lower Cane Creek with Chappel Creek. Each grant runs two years from final signature in July 2026.

The Watershed Advisory Committee has been recruited, and its first meeting is set for the end of October. Some fantastic Berry College students are helping build the plan's GIS layer, standard maps, land cover, impervious surfaces, and also developing an original map for the project, which the students are especially excited about.

NFWF Technical Assistance, Conasauga Riparian Outreach

In Progress

Great news if you're a Blue Shiner, Trispot Darter, and Bridled Darter or a fan of them. A new NFWF grant, $209,579 total, began in August to expand riparian habitat work in the Conasauga River watershed (GA and TN) through landowner outreach and technical assistance. The two-year agreement runs through July 2028 and targets 26 new management plans, 500 acres of conservation tillage, and 200 acres of improved land management, all to benefit the Blue Shiner, Trispot Darter, and Bridled Darter.

North Catoosa Watershed Planning, Catoosa County

Pre-implementation

Limestone Valley signed an agreement in July with Catoosa County and WaterWays, a Chattanooga-based nonprofit, to develop an EPA nine-element watershed plan for South Chickamauga Creek, from Ringgold to the Tennessee border. The plan opens up new funding options for water and community improvement projects in northern Catoosa County. The $35,000 effort is funded by Catoosa County for the Georgia portion and Tennessee American Water for the Tennessee portion, and is expected to take 18 months or less. WaterWays leads the drafting while Limestone Valley will be the technical advisor, fund manager, and final reviewer, and help connect WaterWays with the county. Limestone Valley is now interviewing for the position that will support the work.

U.S. Forest Service Access Improvements

Complete

Limestone Valley finished an access improvement project for the U.S. Forest Service this quarter in the Cohutta and Armuchee Ranger Districts of the Chattahoochee National Forest: more than a dozen new gates built, and several low-water creek crossings repaired and rebuilt to reduce sediment and improve use. Crews also repaired streambanks at a few crossing sites. Hartline Construction, LLC of Trenton, Georgia, built the gates and crossings.

A new gate closing an access road on the Chattahoochee National Forest.
A new gate closing an access road on the Chattahoochee National Forest.
A rebuilt low-water crossing.
A rebuilt low-water crossing.
Rock and coir matting protecting a repaired streambank at a crossing.
Rock and coir matting protecting a repaired streambank at a crossing.

National Fish and Wildlife Foundation Conasauga Working Lands and Fish Passage

In Progress

This NFWF grant runs January 2025 through December 2027 and pays for a field biologist, landowner conservation work, and the Murray County fish passage culverts on Holly Creek Cool Springs Road. As of March 2026, NFWF had paid out about $799,000 of the roughly $1.95 million award, and matching contributions came from landowner engagement, donated equipment, and federal 319 funds on Coahulla Creek. The grant was amended to add culvert construction, which is why the total grew from $624,270 to about $1.95 million. It started as a staff position with a few infrastructure items and now carries large infrastructure work. One Whitfield County culvert was built last year, and the roughly $910,000 Murray County culvert is under construction now, scheduled to finish by the end of November.

National Fish and Wildlife Foundation, UGA Phase 3, Riparian Restoration and Plant Propagation

In Progress

The project's year-two report went to NFWF on July 31 and showed it beating nearly every target. Staff have written 33 management plans (the target was 10), conservation tillage covers 1,792 acres (the target was 150), and 292 acres of invasive plants have been treated (the target was 25). Another 561 acres are under improved management, 30 landowners are receiving cost share, and $3.3 million in government cost share and assistance has gone to local farms (the target was $500,000). Riparian plantings cover 0.92 of 1 targeted mile. A new nutrient program that hauls chicken litter out of the basin was an unplanned success. UGA is still growing plants, and NFWF approved a no-cost extension through June 2027 so partners can finish seed collection.

National Fish and Wildlife Foundation Fire Drill Amendments, Swamp Creek and Goldmine Branch

In Progress

Culverts added to an existing grant through the fire drill amendments are moving forward. One Whitfield County culvert was built last year, and the roughly $910,000 Murray County culvert is under construction now, scheduled to finish by the end of November.

People and partnerships

Student engagement and workforce development

  • Hosted 3 interns this summer, and 2 more are starting this fall.
  • Held a field training in partnership with Dalton State College, led by Dr. Lugthart.
  • Brought on interns from Dalton State College this year. Last year's interns came from the University of North Georgia, led by Prof. Andrew Taylor.
  • Worked with the Georgia Department of Natural Resources, where Kaylee Blackburn mentored interns in the field.
  • Sampled species with The Nature Conservancy, and the interns took part in Paddle GA, an annual multi-day river paddle.

Youth and community outreach

  • Hosted a homeschool 4-H "Creek Stomp" in Lookout Creek on August 19, where about 30 students and parents caught and identified fish while learning about freshwater biodiversity.
  • Led an FFA creek paddle on Lookout Creek on August 14 with Laura Beth Cunningham of UGA Extension, where about 6 high school students explored the creek and discussed water quality.

Community partnerships

  • Partnered with the City of Dalton, the Georgia Association of Conservation Districts, and USDA NRCS on the Trammell Street Community Garden, which has donated 236+ pounds of produce in its first 15 months and is planning a Westwood Elementary pollinator census this fall.

Significant developments

A rare fish, found

The team and summer interns found that the federally threatened Trispot Darter appears to live in Camp Creek all year, not just during spawning season, a find that will help prioritize which barriers get replaced first. Full story is below.

Small Farm Business Conference grant

The Georgia Association of RC&D Councils was awarded a $90,000 grant from USDA Rural Development at the end of the quarter, and Limestone Valley's share is $8,000. The grant runs from October 2026 through September 30, 2027, and pays for each council to host a Small Farm Business Conference in its own region. The conferences are meant to give farmers, agricultural producers, and rural small businesses practical tools, resources, education, and connections to start or grow their operations, with a focus on underserved rural communities. Each conference will look a little different depending on what its region needs. No dates are set yet, and they will be scheduled around planting, growing, and harvest seasons.

What's next

  • Construction Fish passage culverts - The Murray County culvert now under construction is scheduled to finish by the end of November. Two more Murray County culverts begin the first week of December, and two in Whitfield County start in January.
  • Planning Chattooga Headwaters NWQI - The Watershed Advisory Committee holds its first meeting at the end of October, and work on the Watershed Management Plan continues into the next quarter.
  • Infrastructure U.S. Forest Service parking lot - This sediment reduction project will improve the parking lot and the educational gathering areas. The gathering areas have been trampled, so crews will build new outdoor gathering spaces and improve the landscaping to keep sediment out of the river.
  • Program Conasauga riparian outreach - Landowner outreach and technical assistance ramps up under the new NFWF technical assistance grant.

Stories from the field

334 Barriers and One Rare Fish

The Trispot Darter does not look like a fish worth building a summer around. It is small, secretive, and spends most of the year in the mainstem of larger rivers and creeks. But every winter, it migrates upstream into narrow, groundwater-fed tributaries to spawn, sometimes turning up in puddles barely big enough to hold it. If a culvert along the way is too small, too perched, or too old, the fish simply cannot get where it needs to go.

Finding out which culverts are blocking that migration, across an entire watershed, is not a job for one person. This summer, it was the job of a team of summer interns.

Three summer interns in waders sitting at a creek, holding up a clear tank with a fish sample

Summer interns with a fish sample during the 2026 field season.

Training ran May 18 through 20. The first day was virtual, a webinar on inland stream crossing surveys. The next two were spent in the field with Dr. Lugthart of Dalton State College, learning to identify a scour pool from a reference reach, and how to properly use a range finder and stadia rod. From June 1 through July 30, the team worked their way through the Armuchee Creek watershed, pulling candidate sites from the Southeast Aquatic Resources Partnership database and checking each one by hand: waders on, tablet out, recording power lines, electric fences, and habitat quality at every crossing.

By the end of the season, they had surveyed 334 sites. Twenty of those were new discoveries, added to the shared map for the first time. Thirteen stood out as strong candidates for replacement: structures in poor enough condition, and with good enough Trispot habitat, to be worth Limestone Valley's limited construction dollars.

Map of aquatic barriers assessed in the Upper Coosa: 1,003 in 2024, 690 in 2025 and 334 in 2026, 2,027 to date, with yellow triangles marking restored aquatic passages

Aquatic barriers assessed in the Upper Coosa so far: 1,003 in 2024, 690 in 2025, and 334 in 2026 (2,027 to date). Yellow triangles mark restored fish passage sites. Map: Kaylee Blackburn, Georgia DNR.

Then came Camp Creek, a tributary to the Oostanaula, and something better than a bad culvert. In January 2026, on a last-minute stop on the way to other survey sites, Kaylee Blackburn and a colleague netted 19 Trispot Darters within ten minutes. The team kept monitoring through the year, but doubted they would find the fish again in summer. On July 17, interns joined DNR staff to check likely summer habitat. It was extremely hot and humid, and the first stretches turned up nothing, but they kept going and found three adults together in a cooler, deeper pool with leaf litter. Fish that spawn in winter and are still there in July are not just winter visitors passing through; they appear to live there. It is exactly the kind of data point that turns a prioritization spreadsheet into a real decision about where to spend the next construction dollar. Sampling of this federally threatened species is done under appropriate USFWS permits.

A Trispot Darter in breeding colors resting on the sandy bottom of Camp Creek

A Trispot Darter in Camp Creek. Photo: Kaylee Blackburn, Georgia DNR.

This year marked the third straight summer of the internship program under Limestone Valley's America the Beautiful cooperative agreement with Georgia DNR (now called American Ecosystem Restoration), and the first year the interns came from Dalton State College. Last year's interns came from the University of North Georgia, under a cooperative agreement led by Prof. Andrew Taylor. Along the way, the team sampled fish, mussels, and crayfish alongside DNR staff, and again with The Nature Conservancy during Paddle GA, an annual multi-day paddle down a section of river that doubles as educational outreach. At that Paddle GA float, two interns canoed the entire day with a single paddle between them after the other paddles went missing between the trucks. They got stuck a few times and nearly flipped, but they were carried to their destination with some work, currents of the river, and good humor.

In their own write-up of the season, the interns didn't dwell on the heat or the poison ivy. They wrote about the skills: teamwork, road safety, adaptability, and a better understanding of local watersheds and aquatic species. They wrote about the people: "Kaylee was a great mentor throughout the internship and always had answers to our questions and taught us all things biology and conservation." And they wrote about wanting more of it, saying they wouldn't have minded if the internship ran longer.

That appetite is the point. It's why Limestone Valley is not just about repairing culverts and restoring streams, but about building people who can skillfully care about the land out their back doors in ways that impact the community and beyond.